Multi-Agent Collaboration for Building Construction

09/08/2020
by   Kumar Ankit, et al.
0

This paper details the algorithms involved and task planner for vehicle collaboration in building a structure. This is the problem defined in challenge 2 of Mohammed Bin Zayed International Robotic Challenge 2020 (MBZIRC). The work addresses various aspects of the challenge for Unmanned Aerial Vehicles (UAVs) and Unmanned Ground Vehicle (UGV). The challenge involves repeated pick and place operations using UAVs and UGV to build two structures of different shape and sizes. The algorithms are implemented using the Robot Operating System (ROS) framework and visualised in Gazebo. The whole developed architecture could readily be implemented in suitable hardware.

READ FULL TEXT

Please sign up or login with your details

Forgot password? Click here to reset